The main requirement of the customer was to achieve an adequate level of service for Maintenance and Assistance. Additionally, there was the obsolescence of the plant’s automation and control system; Additional requirement: verify the safety level and, if necessary, adapt it to the regulations; It was not possible to have a plant shutdown lasting more than two weeks