Raw material and packaging management for production
Solutions
Automated Warehouse
software
revamping
Sector
Manufacturer
Challenge
Beyond significantly reducing ground storage space, it was necessary to automatically and efficiently feed the production lines located on the first floor of the new building while considering future expansion to the second floor.
Solution
Design and construction of an automated warehouse and material handling system, including shelving, mechanical components, electrical control installation, and automation software
Shelf storage for plastic bins
Stacker cranes with telescopic fork devices for double-deep bin handling
Material handling system with weight and dimension control at entry, 24V motorized roller conveyors, 24V bin diverters, and elevators connecting to/from the future second-floor production area
Put-to-Light system for order fulfillment management
Optimized management: LogiCON and LogiTRASP supervision software integrated with the company WMS
Key technical data
Bin dimensions: 600x800xH320/520 mm, max weight 75 kg