Through step-by-step interventions to minimize plant downtime, all control system hardware (servers in hot back-up configuration) including the switches of the complex field network connecting the 33 Siemens PLCs (which were upgraded to the 1500 series) were replaced. Maintaining all pre-existing functional characteristics, the PLC and control system software was rewritten, implementing improvements shared with the customer.